Energy projects run on tight schedules with demanding documentation. We combine inspection, expediting and FAT for equipment manufactured in Turkey.
01Schedule critical, documentation heavy
Energy and power equipment includes generators, transformers, switchgear, steel structures, towers, pressure parts, piping, wind turbine components and solar mounting systems. Projects typically require detailed ITPs, vendor documentation and expediting.
QUALITAS TR supports EPC contractors and owners with inspection and expediting programmes for Turkish suppliers, covering structural, mechanical and electrical scopes.
02Typical quality risks we see
- Vendor document delays
- Long lead item slippage
- Galvanizing and coating defects on structures
- Welding quality on towers and frames
- Electrical test gaps
- Incomplete data books
03How QUALITAS TR supports energy and power buyers
| Service | What we do in this sector |
|---|---|
| Production and Procurement Expediting | Expediting of long lead and critical path items. |
| Steel Structure and Fabrication Inspection | Towers, frames and solar structures. |
| Electrical and Instrumentation Inspection | Electrical equipment and panels. |
| Factory Acceptance Testing (FAT) | FAT of equipment and systems. |
| Documentation and Shipment Readiness Expediting | Vendor documents and data books. |
04Key inspection points
- ITP implementation
- Material traceability
- Welding and NDT
- Galvanizing thickness
- Electrical routine tests
- FAT
- Packing and loading
- Data book review
05Standards and requirements
Requirements vary by equipment type: IEC standards for electrical equipment, EN 1090 for steel structures, ISO 1461 for galvanizing and the project specification for testing and documentation.
06The sector in Turkey
Turkey has significant manufacturing capacity for steel structures, galvanizing, electrical equipment and wind tower components, serving domestic and export projects.