Service family 09

Factory acceptance testing, SAT and site activities

Witnessed proof that equipment performs before it leaves the factory, and verified installation and handover at site.

Overview

The last chance to find problems cheaply

A defect found at the factory acceptance test costs hours to fix. The same defect found after installation costs weeks, and sometimes a production shutdown. FAT is the moment when the buyer confirms, with the supplier's equipment and engineers still available, that the product performs as specified.

QUALITAS TR witnesses FAT on behalf of buyers: reviewing the test procedure in advance, confirming instrument calibration, witnessing each test step, recording results, managing the punch list and issuing a clear acceptance recommendation.

At site we support installation inspection, site acceptance tests, commissioning support and the review of final handover documentation, providing continuity between what was tested at the factory and what is accepted in the field.

Services in this family

Each service page explains scope, methodology, standards and deliverables.

09.01

Factory Acceptance Testing (FAT)

FAT procedure review, readiness check, test witnessing, punch list management and acceptance recommendation.

Service details

Complete scope of activities

Test witnessing and site activities.

  • Factory acceptance testing (FAT)
  • Site acceptance testing (SAT)
  • Performance test witnessing
  • Functional test witnessing
  • Load test witnessing
  • Pressure test witnessing
  • Electrical test witnessing
  • Equipment inspection
  • Commissioning support
  • Installation inspection
  • Site quality monitoring
  • Punch list management
  • Final handover documentation review
  • Test procedure review
  • Instrument calibration verification

How we work

A FAT that produces a decision

Preparation determines whether a FAT is a formality or a real acceptance test.

  1. Procedure review

    Test procedure checked against the specification: test steps, acceptance criteria, instruments, duration and records.

  2. Readiness check

    Pre-FAT confirmation that the equipment is complete, internally tested and documents are available. Avoids wasted trips.

  3. Witness

    Each step witnessed, values recorded, deviations noted. Calibration certificates of test instruments verified.

  4. Punch list

    Open items categorised by whether they prevent shipment, with owners and dates.

  5. Recommendation

    FAT report with acceptance recommendation, conditions and the punch list for close-out.

Frequently asked questions

Who writes the FAT procedure?

Normally the supplier, approved by the buyer. We review it before the test and propose additions where specification requirements are not covered.

Can a FAT be witnessed remotely?

Partially. Remote video witnessing can support simple tests, but measurement verification, instrument checks and close examination need a person on site. We advise which parts can be remote.

Direct contact. No forms.

Discuss your inspection, audit or project requirements

Send us the purchase order scope, drawings, specifications or ITP and the supplier location. You will receive a written proposal with scope, inspector profile, schedule and reporting format.

Emailinfo@qualitas.tr Telephone+90 533 197 19 81
OfficeBeştepe Mah. Nergiz Sok. 7/2 Kat:3 No: 87, Yenimahalle, Ankara, Turkey